Client:
BEWAG AG & CO.KG,
Vattenfall Europe Information Services GmbH
Architect
Max Dudler, Berlin
Electrical Contractor:
AIC -- Architekten Ingenieur Consult GmbH
Installer:
Zeka Elektrobau GmbH
Photos:
Achim Hatzius

Product: NEO CASSETTE
Product: NEO Prisma
Product: NEO Opal

Between 1925 and 1932, Berlin’s municipal electrical company built a modern power grid for three-phase power supply. This substation building, built by Hans Heinrich Müller in 1926, has a highly linear design which provided a clear direction for the lighting design. Light levels in its very different rooms have been provided by neo luminaires installed as horizontal or vertical lines of lights.